Solar energy

AJ Bell Stadium

Project Stats

1
KWP
1
Tonnes Co2 Reduced P.A
1
KWH Per Year

Project: AJ Bell Stadium, Salford

Client: Peel

Roof Type : Trapezoidal Steel

Date: September 2015

The AJ Bell Stadium provides an arena for Sports, Events and Conferences for businesses and communities throughout the North West and is home to Salford City Reds and Sale Sharks. iGen were selected by Peel Holdings who are the landlord of the Salford Community Sports Stadium, to design and construct a 1896 panel 250kWp solar pv system to the south stand roof.  The panels fitted to the trapezoidal Kingspan steel roof using a light weight mini rail fixing method.  

9 inverters were installed and fed into a designated PV Dist. Board c/w G59 relay. The PV Distribution board was connected back in to clients LV panel, whereby 2 ways had to be combined during an overnight shutdown, this was time critical and took place between 12am and 5.30am.

solar pv
solar pv

Share This Post

Share on facebook
Share on linkedin
Share on twitter
Share on email

More to Explore

Novus Knutsford Solar PV
Business

Novus Knutsford

iGen installed a 104.7 kWp system at Novus Industrial Park in Knutsford. The development is perfectly placed to serve Manchester, Cheshire and the wider North West region.

Solar PV Crewe Commercial Park
Business

Crewe Business Park

iGen installed a 94.05 kWp solar system at Crewe Buisness Park on behalf of Glencar Construction. The scheme comprises 2 units totalling 135,000 sq ft with two inboard office spaces.

commit to clean energy solutions

Make Climate Change Your Business

solar PPA
solar FAQ's